On July 14, 2026, a 30-meter section of the CC block embankment in Ilisha, Bhola, collapsed due to strong currents in the Meghna River. This event has forced the closure of the Ilisha-Dhaka launch terminal, displaced local businesses, and put over 100,000 residents in East Ilisha, West Ilisha, and Rajapur unions at risk of flooding.
Flood category
Tidal Flood
Trigger / cause
Strong river current during high tide (Amabashya impact)