A collapse of the Shilok Bridge-ghat Bailey bridge on the Rangamati-Bandarban road, combined with the failure of the Sukbilash Dudhpukuria rubber dam embankment in Padua Union, Rangunia, occurred following intense mountain torrents starting July 10, 2026. The bridge and 150 feet of the connecting road were damaged, severing road connectivity until repairs allowed for restoration of traffic on July 25, 2026.
Flood category
Flash Flood
River
Shilak Canal
| Scope | Source wording |
|---|---|
| 1 · upazilla | রাঙ্গুনিয়া উপজেলা |
| 1 · union | পদুয়া ইউনিয়ন |
District or Upazila level government authorities
Repaired and restored traffic flow on July 25, 2026.
Note: Installed Bailey bridge to restore traffic flow.