logo
Moderate
Flash Flood
Ongoing
7 sources
2 entities

Flash flood, waterlogging, and infrastructure/agricultural damage in Kalmakanda, Netrokona

Continuous heavy rainfall and upstream runoff from the Meghalaya hills caused the Ubdakhali River in Kalmakanda, Netrokona, to overflow. Over 5,000 people were affected across five unions, including Nazirpur, Kharnoi, and Lengura. The incident caused extensive damage to 15 educational institutions, a 100-foot section of the Nalchapra-Bazarubaluchara school road, 26km of road network, 200 hectares of Aman paddy seedbeds, 50 acres of cropland, and over 100 fish ponds. The river is flowing 18 cm above the danger mark.

Sunday, 19 July 2026 at 08:00 amKalmakanda, Netrokona (including Kharnoi, Nazirpur, and Lengura unions)

Hazard specifics

Flood category

Flash Flood

River

Ubdakhali River

Water depth (m)

0.18

Trigger / cause

Heavy rainfall and upstream water flow

Affected scope

1 Record
ScopeSource wording
1 · upazillaকলমাকান্দা উপজেলা
1 · upazilla
কলমাকান্দা উপজেলা

Involved entities

2 Records
Primary School Building
Structure
Residential Building
Nalchapra-Bazarubaluchara school road
Infrastructure
Bridge
Roktakto.com can make mistakes. Check important info.