A bridge under construction in Gopalpur, Lalpur, Natore, developed significant cracks before its inauguration. Residents have raised concerns regarding the use of low-quality construction materials, while the contractor claimed the damage was caused by an excavator during soil filling. The Upazila Executive Officer has promised an investigation into the matter.