A 1.5-kilometer herringbone bond road in Daulatdia Union, Goalanda, Rajbari, suffered widespread collapses at 15-20 locations shortly after its completion on June 10, 2026. Built at a cost of over BDT 12.5 million, the road developed cracks and subsidence following continuous rainfall, raising concerns about the quality of construction and potential use of substandard materials by the contractor.