The Badalgachhi Upazila Health Complex in Naogaon is operating from a dilapidated building constructed in 1975, which exceeded its 50-year structural lifespan in 2025. The presence of roof cracks, falling plaster, and exposed rebar poses a persistent safety threat to patients and staff as services continue to operate.
District or Upazila level government authorities
Inspected the building with engineers and initiated temporary repair works to continue operations.