Bridge reconstruction on the Kushiyara Dyke in Balaganj, Sylhet, has been stalled by local landowners, leading to severe waterlogging. The blockage of the drainage system has caused significant damage to farmland, residential areas, and local community structures, prompting administrative intervention to resolve the dispute and address drainage issues through canal dredging.
Flood category
Overbank Flood